Can I run DrySpace V-panels over the top of a beam?

Panels must always stop 3” from the beam. In most cases, the low point of the Panel will interfere with the beam causing water to dam on the Panel. Combo Brackets should stop 1” from the beam. Read the full installation instructions with a supporting beam or decks with a cantilevered area beyond the support beam.

Scroll to Top